Underground piping and drainage systems materials.
Underground wiring and all electrical items.
Cabinets, wardrobes, flooring, and all aluminium and iron works.
Kitchen and bath accessories.
Materials for the basic house structure including foundation, floors, walls, roofing, and plastering.
An estimated 3.35 Crore for a complete double-storey build with material.
Currently around PKR 5,324/sq. ft. for a complete build with material.
Approximately 1.85 Crore with material.
Foundation, walls, roof slabs, plaster, and basic electrical/plumbing rough-in — everything before finishing.