Underground piping and drainage systems materials.
Underground wiring and all electrical items.
Materials for the basic house structure including foundation, floors, walls, roofing, and plastering.
An estimated 64.69 Lakh for a complete double-storey build with material.
Currently around PKR 5,324/sq. ft. for a complete build with material.
Approximately 35.59 Lakh with material.
Foundation, walls, roof slabs, plaster, and basic electrical/plumbing rough-in — everything before finishing.